40 week
188 month
This week i finished half my fitting boxes I learned how to use the parker app it was helpful.I took a online test on excavator safety and learned how to drive a small john deer and stack tires.At work I changed a couple tires and did a oil change on a silage box truck..
Monday, October 27, 2014
Wednesday, October 22, 2014
Tuesday, October 21, 2014
Charging Test and beginning fittings
40 week
144 month
This week we finished the charging system test I learned one on one how to do a correct load test from my very smart teacher. We learned how to use Parker fitting finder to find hydraulic fitting part numbers. This week at work I changed a radiator on a older case tractor I learned preventative maintenance is the only way to operate when you have a ton of money into equipment.
144 month
This week we finished the charging system test I learned one on one how to do a correct load test from my very smart teacher. We learned how to use Parker fitting finder to find hydraulic fitting part numbers. This week at work I changed a radiator on a older case tractor I learned preventative maintenance is the only way to operate when you have a ton of money into equipment.
Monday, October 13, 2014
continue charging systems
40 WEEK
104 MONTH
This week I continued to work on my 12 vehicles we have to do charging and starting system checks on.I did the Freightliner the yellow International the Peterbuilt and a handful of other vehicles .I am getting the hang of how to check these systems the one thing i'm not 100% comfortable with yet is the parasitic load tests but I will get it down this next week.....
104 MONTH
This week I continued to work on my 12 vehicles we have to do charging and starting system checks on.I did the Freightliner the yellow International the Peterbuilt and a handful of other vehicles .I am getting the hang of how to check these systems the one thing i'm not 100% comfortable with yet is the parasitic load tests but I will get it down this next week.....
Monday, October 6, 2014
charging and starting
This week i worked with starting systems and charging systems.I worked on the trainer engine and the starting system demo both I was able to figure out fairly easily. Also we worked on a ton of electric motor boards.
4o week
64 month
Subscribe to:
Posts (Atom)